Дизайн ночного клуба – абсолютно отдельное направление проектирования, requires certain skills and knowledge. To date, in terms of technology are almost no restrictions. Besides, There is a huge amount of building materials and decorating techniques.
Project nightclub includes the following steps:
1. Concept development.
The interior of this institution and its external appearance must match the generated concept.
It includes:
- options for corporate identity;
- room selection;
- initial sketches of the interior;
- distribution guest flows;
- Personnel movement scheme;
- definition format establishments.
2. Selection of premises.
After the development is necessary to choose the room concept:
- Determine with space, should pay attention to the location of the object.
- It is necessary to evaluate it as in, and outside: if he looks attractive, how convenient access, whether Parking.
- It is necessary to take into account the acoustic planning, important, the material from which made the house, What he has soundproofed.
- Ceilings should be over 4 m, to establish a sound and light equipment.
The buildings are often built specifically for the club, but also became popular non-standard solutions: leased roofs of houses and business centers, abandoned shops, factory shop, courts, not less attractive outdoor terraces and underground areas.
3. The functional purpose of the premises, their parameters and capacity.
An important stage of the project is the zoning of the space: selection and technical area for visitors.
- Техническая – состоит из служебных, industrial and domestic areas. All of them desirable to place in the group.
- Visitor space is divided into two parts, depending on the destination: basic (rooms with bars, chill-outs) and auxiliary (lobby, wardrobe, toilets).
4. Development of technological and engineering systems.
The project of this type of institutions includes the development of technological systems of sound and lighting devices, electricians, ventilation, conditioning, intercom, and water supply, sewerage, heating, automatic fire and security alarm.
Initially, the design of these systems should be carried out in accordance with relevant regulations of GOST, SNIP requirements and a legally. All of these rules should be specified in the corner of the consumer, but production of stands this format should be handled by experts.