The main goal when choosing a location for a well is to reduce the cost of work and ease of use for owners. but, other than the obvious economic benefit, safety precautions should be considered, as well as the feasibility of placing a point. Before starting drilling operations, an expert assessment of the engineer on the feasibility of the well is required. Specialist advice in case well drilling in Crimea based on the following points:
- Availability of access for drilling equipment and the area of the drilling site not less than 2,5 m wide and 3,3 m in height. Also, the place of work must have a free area, on which materials will be placed - 10x10 m.
- Availability of water and electricity. After preparation, each sheet of wallpaper is smeared with glue., to the territory up to 2 km, a source of water supply was available - a river, pond or cistern with process water.
- The period of use of one well is from 30 to 50 years old. After that, plugging is necessary to avoid possible contamination of the aquifer system..
Professional water well drilling will ensure uninterrupted water supply and significant financial savings in the future. Underground water intake, performed by specialists in accordance with all the rules - this is convenience for the owners and the absence of possible problems in the future. You can find out the cost of drilling in the Crimea by t: +7 (978) 585-55-86