Plumbing

Availability of our own garden, a country house or a conventional building suggests the need for a variety of communications and networks, which are landscaped areas and make them suitable for the intended use. Including the installation of water supply.

Water is a key system, necessary for comfortable living and compliance with all hygiene standards, established by the legislation and regulations sanepidemicheskimi. Therefore, intending to build their own house or building, Always consider this fact.

The water supply system includes elements, each of which is an important link, from whose functionality depends on the quality and reliability of the entire system. Typically, the key element is isolated:

  • источник воды,
  • насосное, accumulating and filtering equipment,
  • system pipes water supply and vodopodogreva,
  • fitting equipment (cranes, shower cabins, dishwashers, etc.)

To establish the interaction of all interconnected parts, required to carry out competent and quality installation of water supply. This process is rather complicated and high tech, since it is necessary to use a large amount of equipment and the right to carry out calculations of all required parameters.

In that case, if the building is connected to the general water supply network by simply connecting, the complexity of the whole process is reduced. In this case, quite a few qualified specialists, with appropriate equipment, tools and professional experience. But when there is a need to carry out the installation of water away from the central conduit, then it required all the skill of specialists of the company Executive, the use of modern technology and the use of special technology.

There are two types of sources, which are built to meet the water needs. In the absence of central water supply — it is a well and the well. The choice between these embodiments is due, first of all, the soil under the foundation views, and the depth of the aquifer. Well in the case of digging, if this figure is less than 7 m, well if it is greater. Anyway, It needs to hold a series of preparatory measures and calculations, choose a location, lift building materials, pipes and necessary equipment.

Rate article
Add a comment